For lenders, developers and owners Early access

See the project behind the report.

GlassLedger connects, read-only, to the email, project software, files and accounting your project runs on. It tracks what happens each day, flags what changed, and checks each report and invoice against the record.

  • Read-only access
  • Nothing for the project team to install
  • Built on NimbleBrain
1200 Alder Street
148 units · Month 9 of 20
Schedule
On trackWatch
“On schedule.”Elevator delivery date passed. No update in any system.
Budget
On trackOn track
“Within budget.”Committed costs match the budget file.
Draws and invoices
On trackAt risk
“Draw 7 submitted.”Pay application 7 bills work the record does not show.
Subcontractors
On trackWatch
“All trades on site.”Electrical sub quiet for 9 days.
Permits and inspections
On trackOn track
“Inspections current.”Level 4 deck inspection passed.
Open issues
None notedWatch
“No material issues.”14 open. 3 have no next step.
Report dated 19 days ago. Written by the project team.Read 4 minutes ago from 6 connected systems.

Sample project. Illustrative data. Flip between the report and the record.

01 The gap

The project moves every day. The report comes once a month.

Between reports you work from a document the project team wrote about itself.

A

It is weeks old

A monthly report describes work that ended weeks before you read it. A draw request asks you to fund work you last saw a month ago.

B

The project team writes it

The developer, the contractor and the construction manager summarize their own work. You read the summary.

C

It depends on data entry

Project software holds what someone remembered to log. The live conversation runs through email, calls and chat.

Month 1Month 2Month 3
Report and draw3 looks in 90 days
GlassLedgerRead every day
Report or draw arrivesRead, nothing trippedFlag to look atFlag that needs you
02 How it works

It reads the work where the work happens.

A project leaves a trail in the tools people use each day. GlassLedger reads that trail against criteria you set.

  1. 01

    Connect, read-only

    Email, project software, files, chat and accounting for each party, as agreed. The project team installs nothing and fills in nothing.

  2. 02

    Set the criteria

    You say what counts as risk on this project, in plain English. Change the criteria any time.

  3. 03

    It watches

    GlassLedger reads each new message, update, file and invoice against your criteria as they arrive.

  4. 04

    You see it

    A live board, an alert when a criterion trips, and a weekly brief. Each flag links to its evidence.

The systems the project runs on
EmailGmail, Outlook
Project softwareProcore, Autodesk Build, Asana, Jira
FilesGoogle Drive, Box, Dropbox
Chat and meetingsTeams, Slack, Zoom
AccountingQuickBooks, Sage Intacct
Anything with an APIConnected per project
GlassLedger
Your criteria, in plain English
  • Flag any topic with five times its usual message volume.
  • Flag any trade with no activity for seven days.
  • Flag any issue with no next step after five days.
  • Flag any invoice line the record does not support.
Reads. Never writes, sends or approves.
What reaches you
The boardGreen, yellow or red by area, with history
AlertsEmail, Slack or Teams when a criterion trips
The weekly briefWhat moved, what stalled, what to ask
AnswersAsk a question, get the sources with it

Connectors for Gmail, Outlook, Teams, Slack, Zoom, Google Drive, Box, Dropbox, Asana, Jira, QuickBooks and Sage Intacct exist today. We build connectors for construction systems such as Procore and Autodesk Build per project.

03 What it watches

Three things a monthly report leaves out.

Each flag comes from the record, with the thread or file behind it.

Activity

Activity that breaks pattern

GlassLedger tracks the usual volume for each topic, trade and party. Twenty emails on one topic in a day is a signal. A subcontractor who goes quiet for a week is one too.

You get the flag and the threads behind it.

Level 2 transfer slabMessages per day · 14 days
Spike31 messages in one day. The usual is 4.
Electrical subcontractorLogs and messages per day · 14 days
QuietNo log, message or delivery for 9 days.
Follow-through

Issues raised and never closed

Someone raises a problem in an email. Nobody opens a task, names an owner or sets a date.

GlassLedger keeps a running list of each issue it finds. It flags the ones with no next step after the number of days you choose.

Open issues14 open · 3 with no next step
IssueRaisedNext stepStatus
Groundwater at the east footing14 days agoNone in any systemStalled
Fire alarm panel submittal9 days agoNone in any systemAging
Elevator delivery date21 days agoSupplier call ThursdayMoving
Added blocking, Levels 3 and 45 days agoPricing due FridayMoving
Reconciliation

Reports and invoices that don’t match the work

A pay application says mechanical rough-in is 60 percent complete. GlassLedger checks that line against daily logs, deliveries, inspections and email.

You see which lines the record supports before you fund.

Pay application 7 against the record5 of 12 lines shown
LineBilledWhat the record showsResult
Concrete, Level 4 deck100%Pour logged on the 12th. Inspection passed on the 14th.Supported
Framing, Levels 3 and 480%Rework thread open since the 20th.Check
Mechanical rough-in60%No logs, deliveries or RFIs since the 18th.No support
Stored materials, switchgear$186,400No delivery ticket in the files.No support
Glazing deposit30%Supplier confirmation and deposit invoice on file.Supported

No gaps when the project software goes stale

People get busy and stop logging. GlassLedger reads email, files, chat and accounting alongside the project software. When the schedule sits untouched for three weeks, GlassLedger flags it and keeps tracking the work from the other sources.

It also watches for

Tone that turns

Messages between the contractor and the engineer shift from routine to adversarial.

Dates that pass

A promised delivery date goes by with no update in any system.

Numbers that move

A budget line or contingency balance changes between two versions of a file.

People who drop out

A superintendent or project manager stops appearing in the threads.

04 Who it’s for

Built for whoever carries the risk.

Choose your seat at the table.

Construction lenders, debt funds, private credit

You fund each draw against a report the borrower’s team wrote. Your inspector walks the site once a month. Between visits you rely on what you’re told.

With GlassLedger
  • Check each draw against the daily record before you fund it.
  • Hear about a schedule slip, a stalled trade or a contractor dispute the week it starts.
  • See each loan in your book on one board, sorted by what changed.
  • Write read-only access into the loan documents and start monitoring at closing.
Questions you can ask it
Does draw 7 match the work?Which loans moved to yellow this month?Who has discussed the contingency this week?

The same ledger, different criteria.

Construction is where GlassLedger starts. Wherever one party carries the risk of work other people do, the work leaves a trail.

Private equity

An operating partner watching management teams and key vendors.

Criteria

Covenant headroom, key-person and key-customer signals, disputes.

Insurance and surety

An underwriter or claims team watching the insured or bonded contractor.

Criteria

Incidents, safety, subcontractor defaults, disputes in email.

Outsourced delivery

A vendor manager watching a provider’s delivery teams and tickets.

Criteria

Failures raised by email and never ticketed, scope creep, turnover.

Your setting

Fund administration, franchising, M&A integration, public infrastructure, supply chain.

Criteria

You bring the setting. We write the criteria with you.

05 What you get

A board, an alert, a brief and an answer.

Four views of one record.

The board

Green, yellow or red for each area of each project. The history shows what moved and when.

Alerts

A message by email, Slack or Teams when a criterion trips. You set the thresholds.

GlassLedgerTue 09:14
1200 Alder Street: draws moved from yellow to red

Pay application 7 bills mechanical rough-in at 60 percent. The record shows no mechanical activity since the 18th.

Criterion: any invoice line the record does not support
Confidence 0.91 · 4 sources attached

The weekly brief

One page on what moved, what stalled and what to ask about. Your weekly review starts from it.

Weekly brief · Week 381200 Alder Street
Moved
Draws to red. Schedule to yellow.
Still open
14 issues. 3 have no next step.
Ask Thursday
Where is the switchgear? Who owns the groundwater issue?

Ask it anything

Plain-English questions, answered from the record with the sources attached.

The record

Each flag keeps its evidence, its confidence score and what your team did about it. You hold that history for the life of the project.

WhenFlagEvidenceConfidenceWhat happened next
Tue 09:14Invoice line the record does not supportPay application 7, daily logs, delivery tickets0.91Lender held the line item pending a site check.
Mon 16:40Topic spike: Level 2 transfer slab31 emails, 2 RFIs0.87Owner’s rep called the structural engineer.
Fri 11:02Electrical sub quiet for 7 daysDaily logs, email0.94Contractor confirmed the crew returns Monday.
06 Under the hood

Built on NimbleBrain.

GlassLedger runs on the NimbleBrain platform, an open-source runtime for AI agents. Each part of GlassLedger is a part of the platform you can inspect.

NimbleBrainNimbleBrain is the open engine for AI at work: a model-agnostic runtime that runs agents on your systems, inside your boundary, and the senior team that builds, ships, and runs them with you.
In GlassLedgerOn NimbleBrainWhat that gives you
ConnectionsConnectors · MCP servers

One read-only connector per system, each with its own sign-in and scope. A system with an API can get a connector.

One project, one roomWorkspaces

Each project or portfolio runs in its own workspace. One project’s data stays out of another’s.

Your criteriaSkills

Plain-English instructions with a version history. You can read them, change them and roll them back.

The watchAutomations

Scheduled and event-driven runs read what is new. Each run has a budget and leaves a record.

The second checkJudge

A separate pass scores each flag against the criterion it tripped and attaches a confidence.

The recordMemory

Durable project memory holds each flag, fact and status change. The trend lines come from it.

The board and the chatApps · Synapse

The board is an app in your workspace. The chat calls the same tools, so both show the same record.

Your choice of modelModel gateway

One gateway holds the provider keys, caps each run and logs each model call.

Runs in your boundary

A private tenant we host, or your own cloud. Your data is never pooled with another client’s.

No model lock-in

Any model, from any provider. Change it as better ones ship.

Open source runtime

The runtime under GlassLedger is open source. Your technical team can read the code.

07 Limits

Read-only. By agreement. With evidence.

A monitor earns trust from the parties it watches as well as the party it reports to. These limits are built in.

Read-only

GlassLedger reads. It cannot send an email, edit a schedule, approve a draw or change a file.

Access by agreement

Each party’s access is scoped and documented before anything connects. You can write it into the loan or development agreement.

Evidence with each flag

A flag links to the thread, log, file or invoice behind it. You check the source yourself.

Your people decide

GlassLedger flags and reports. Your team makes the call on each one.

Alongside your reports

The monthly report, the draw and the inspection stay in place. GlassLedger tells you if they match the work.

A private boundary

It runs in a private tenant or in your own cloud. Your data is never pooled with another client’s.

Questions people ask first

Does GlassLedger replace my construction monitor or inspector?

No. Your monitor walks the site and certifies the work. GlassLedger reads the record between visits and hands your monitor a list of what to look at.

What if the project team barely uses the project software?

GlassLedger reads email, files, chat and accounting too. It reports from those sources and flags the stale system.

Does the project team know it is connected?

Yes. Each party agrees to its access, and the scope is documented before anything connects.

How long does a first project take?

The starting engagement covers one project over six weeks. It ends with a review of what GlassLedger caught and what the reports missed.

Which AI model does it use?

You choose. NimbleBrain works with any major provider, and you can change the model later.

Does it work outside construction?

Yes. The criteria change and the monitor stays the same. The same approach fits private equity, insurance and outsourced delivery.

Starting engagement · one project, six weeks

Start with one project.

Bring a project you have real exposure to. Fixed scope, fixed price. The first conversation is thirty minutes on that project and what you can see of it today.

By the end of six weeks you have
  1. Each party connected, read-only, with access agreed and documented.
  2. The criteria for this project, in plain English and running.
  3. A live board and a weekly brief for whoever carries the risk.
  4. A week-six review of what it caught and what the reports missed.